top of page

STAY IN THE LOOP

Get tutorials and blog posts delivered right in your email inbox.

Me Made May 2016, Week 4: Finish Those UFOs

May 31, 2016
1 min read

Week 4 was spent entirely on eradicating that UFO pile of sewing projects. Waistband elastic seems to be my arch nemesis because what was left in that pile was half-finished leggings and undies just waiting for some sort of waistband solution to happen.


  • 3 pairs of leggings

I finished three pairs of leggings: one in stretch denim, one in denim-look jersey, and one in single jersey. Next was four pairs of undies. They’re all based on the same hipster pattern but I used different techniques, like fold-over-elastic, boxer elastic, and Framilon.



What I didn’t finish – or in fact work on at all – was the pintuck dress from Ottobre. But I ordered an invisible zipper presser foot and a rolled hem presser foot so, a step in the right direction. I still aim to get that dress sewn this summer.

My UFO pile went from this…


to this! Just two things: pattern pieces cut out for one tunic and another pair of leggings.


All in all, a pretty successful Me Made May!

Comments


Recent Posts
 
About the author

Susanna Winter is a knitwear designer, creating timeless and elegant pieces with clean lines. She has been knitting for over 20 years, knit blogging since 2007, and designing knitting patterns professionally since 2016.

​

Subscribe to blog

Join my mailing list and get new blog posts automatically in your email inbox.

bottom of page